Thursday, March 3, 2016

Update on bathroom remodel

Things have grinded to a half on the bathroom remodel.  I got the hole cut in the countertop for the sink and the faucet.  Ordered the faucet but it has taken forever and it is still not in.

The sink will be recessed in to the counter top.  The faucet will be towards the back at the sight side of the sink.  The countertop has about 6 coats of danish oil on it and 3 coats of a marine grade polyurethane to protect it from the water.




Did some dry fitting of the sink on the vanity.  Had to make sure it was all going to fit together and look o.k.


Still need to do the doors, but the rails and stiles are cut.  Need to do some shaping on those and then put them together.


No comments:

Post a Comment