Doors are oiled and installed, Lights installed and working

Got all the doors sanded and oiled.  They were installed last weekend.






Also got the lights installed in the tops of all the cabinets on the left side.  Probably one of the scariest things to do on the entertainment center.  During construction of the cases, I drilled holes in the tops where I wanted the lights to go.  Then I ran string from that hole to the back of one of the cabinets closest to the outlet.

When it came time to install the lights, I had to install the brackets in the top cases, pull the wires through the holes with the strings I had installed earlier, then hook up all the connections to the transformer, the power source and plug in to the wall.

It sounded harder than it was, but got those in this past weekend.

The only thing left to do now is install the glass shelves in the end, corner unit and the crown moulding.  Already have the glass shelves cut, just need to decide on the hardware to hold the glass shelves. 