Friday, January 24, 2014

Update

Been a little busy lately getting the family room downstairs painted.  Have just about everything on the entertainment center completed except the crown moulding.  Need to get the ceiling painted around the EC before we install the crown moulding.



The handles are on, the lights are in.  Just need to get the glass shelves in the end case and the crown moulding and we will be done.

The ceiling has two coats of paint and almost done with the first coat of the walls.  The baseboards and the door frames have a new coat of paint as well.

Once I get done with the crown moulding, there will be lots of vacuuming and dusting to do down stairs, but it is looking good.

Also been watching the Provo Temple rebuild/remodel.  All four corner points are on the temple, as well as the large one in the middle.  There is scaffolding almost around half of the temple and it looks like they are sanding and refinishing the bricks on the outside walls.  Lots of dust coming from the scaffolding area.

This picture is taken looking west, and it does not look like the fourth and last peak is on the temple in this picture, but there are five peaks on the temple now.  There are also crews doing the roof of the temple.  Steep footwork there!!

No comments:

Post a Comment